Week 12: Aug 27-30
We have a front door and windows!
All the electricity was ran, light switches, light fixtures, etc. were put into place.
Put the gas fireplace in.
Heating/Cooling was completed
Plumbing was completed
Week 13: Sept 3-6
Not much happened. They were supposed to insulate but because our roof wasn't on, they were afraid of it getting wet.
Instead, this week our contractor moved a beam in the basement, opened this walkway up at the bottom of the stairs,
and framed in our utility/storage room.
This week they also did our inspection which went well. Our contractor had to make one minor small change and that was it.
I'm caught up on my house updates.....phew!
This next week they are insulating, putting up drywall, and putting on the roof! (hopefully it all gets done.)