Week 16
September 24-28
The frame around the garage was put on.
Wood was put on stairs
They put up the frame around the front window
Engineered hard wood was installed in kitchen, dining room, and living room.
Tile was started. Not quite done, but almost.
This is the master bathroom jetted tub.
Master bathroom shower
Floor of master bath shower
Laundry room tile
Kids Bathroom
Kids Tub/Shower



No comments:
Post a Comment